Show an email

GET /hyperkitty/api/list/[email protected]/email/6SGOXDLUWHSCWQGW2SU44XONEJ3DRHCG/?format=api
HTTP 200 OK
Allow: GET, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "url": "https://mailman.amsat.org/hyperkitty/api/list/[email protected]/email/6SGOXDLUWHSCWQGW2SU44XONEJ3DRHCG/?format=api",
    "mailinglist": "https://mailman.amsat.org/hyperkitty/api/list/[email protected]/?format=api",
    "message_id": "[email protected]",
    "message_id_hash": "6SGOXDLUWHSCWQGW2SU44XONEJ3DRHCG",
    "thread": "https://mailman.amsat.org/hyperkitty/api/list/[email protected]/thread/6SGOXDLUWHSCWQGW2SU44XONEJ3DRHCG/?format=api",
    "sender": {
        "address": "yono_adisoemarta (a) yahoo.com",
        "mailman_id": "0f8c5fb66117469a95e91d6a2563b698",
        "emails": "https://mailman.amsat.org/hyperkitty/api/sender/0f8c5fb66117469a95e91d6a2563b698/emails/?format=api"
    },
    "sender_name": "P. Suryono Adisoemarta",
    "subject": "[AMSAT-BB] SS-1 Satellite - First 24hr Report",
    "date": "2023-01-07T15:13:50Z",
    "parent": null,
    "children": [],
    "votes": {
        "likes": 0,
        "dislikes": 0,
        "status": "neutral"
    },
    "content": "Quick SS-1 (Surya Satellite 1) Report after a meeting with the SS-1 Satellite team an hour ago:- SS-1 was deployed at 08.03 UTC on Jan 6, 2023- Right on schedule, 30 minutes after deployment first packet was heard. This packet was digipeated via ISS as it is still close-by- From the telemetry bits, both VHF and UHF antennas were properly released- Battery voltage was observed at 3.83 volt- At around 13.00 UTC SS-1 went quiet, the team concluded it went into \"hibernation mode\" due to low voltage- This morning at around 00.30 UTC one observer in Bali received a direct (not digipeated) packet, so it came out of hibernation mode with high voltage as the radio power is high- Consecutive packets were received direct by various APRS satgates- At around 07.00 UTC telemetry shows a critical low battery voltage and SS-1 went into hibernation again- As the SS-1 team concluded that the satellite is working as designed, 2 hours ago when SS-1 pass above Jakarta, the team uplink commands to reduce the beacon rate, to raise the battery voltage, and gather more data points on the power budget model.\n73 de Yono - YD0NXXORARI HQ - Head of Satellite Division\n\n\n",
    "attachments": [
        {
            "email": "https://mailman.amsat.org/hyperkitty/api/list/[email protected]/email/6SGOXDLUWHSCWQGW2SU44XONEJ3DRHCG/?format=api",
            "counter": 2,
            "name": "attachment.html",
            "content_type": "text/html",
            "encoding": "utf-8",
            "size": 1893,
            "download": "https://mailman.amsat.org/hyperkitty/list/[email protected]/message/6SGOXDLUWHSCWQGW2SU44XONEJ3DRHCG/attachment/2/attachment.html"
        }
    ]
}