In a message dated 24/11/2007 12:17:24 GMT Standard Time, mail@mike-rupprecht.de writes:
All,
just received the following frames:
KE7EGC>UNDEF,TELEM,qAo,DK3WN-1:GeneSat1.org6C57F4C70030014B01FC010000A3019F4 002195A86B7ED348638
Hello Mike. Looks like their command station refit has finished and they are operational again. Apparently it's possible to e-mail them and get a schedule for the beacon.
73
David
Mission Operations Log Summaries 10/16/07 - The ops team was finally able to get back into the SRI station although some work remains to be done (like re-installing the UHF feed). Two contacts were run today, lde by the fearless I. Mas. The beacon was re-enabled and verified, and state of health data was downloaded given the extended time over the past 2 months during which no operations were run. Satellite bus health is nominal, and the previously observed payload temperature control anomaly continues (again, we note that the anomaly is for a function that is no longer needed to support the mission). A new ops trainees participated in the contacts and showed off by hand-tracking the beacon with a hand-held antenna and transceiver (nice job Jose!). Post-pass logging was initiated via the internet from Munich! We currently plan to run the next set of contacts next week, and the ops team is working with the engineering team to establish a set of end-of-life test objectives. CK Mid-August through Mid-October Summary - The SRI station is unavailable during this time for maintenance, retrofit, and other test operations. The beacon will be shut off during this period. CK Early August 2007 Ops Summary - The ops team is training several new mission controllers for educational purposes as well as initial training for the team's next satellite, PharmaSat. The team is retrieving routine health data and is also conducting power stress tests (which occasionally require the beacon to be turned off) in order to assess the power generation capabilities of the system. The satellite bus health is nominal. Payload health is good with the exception of the payload temperature control process (temp is below setpoint, the control loop is activated, but a much lower than nominal heater current draw exists); we will monitor this system and develop a plan to evaluate the heater FET and/or other possible root causes. No operations during the week of Aug 12 given the attendance of most of the team at the AIAA Conference on Small Satellites (which includes presentation of several GeneSat-1 related papers). CK July 2007 Ops Summary - Only limited operations conducted in July due to routine maintenance with the SRI station and its use to support other studies. Satellite beacon off. CK