I am working with the satellite to get the Field Day configuration operational long term.. I turned TXB back on during the 1300Z pass.
During this pass I adjusted the TX levels to TXA 240 mW and TXB 290 mW. These are lower power levels than I have ever used before, but necessary to get the satellite through the 16+ minute eclipses each orbit. The SQRX receiver uses about 110 mA that must be subtracted from the total TX power used.
I think I am close and expect to get the correct settings over the next 24 hours. It is also necessary to change the L/U analog operation to digital over the eastern US in order to download the telemetry to see how the satellite is performing over multiple orbits.
73, Gould, WA4SXM AO-51 Command Station