For our meeting this Thursday I would like to answer 2 questions:
Are there any other tasks that should be on this list? Do we have the manpower/interest is completing these tasks for UND?
Remaining Pacsat tasks as of 4/22/2024, revised 4/25/2024
Current Software Tasks: Software for monitor and control of 70cm power amplifier Host IHU telemetry interface Error reporting Minor issues ( commanding, telem control, etc )
Current Hardware Tasks: 7 components that do not fit layout Redesign power system and add to layout ( Vsys = 5.6v Buss voltages = 5.0v, 3.3v, and 1.2v) Correct I2C connection to temperature sensor Select crystal and add to layout Correct layout for T601 Power plane issues for Power Amp and 5V regulator Test 70cm Power Amp circuit Correct preamp bias issues Test receivers and determine differential vs single ended RX inputs Layout was done for Rev C schematic. Add Rev D changes
Other tasks for a Flight Ready design: Measure power requirements Identify configuration changes for flight (config.h) Create Interface Control Document
participants (1)
-
Bill